An asset manager is reviewing an option-free government bond with a modified duration of 7.5. Yields have suddenly spiked by 200 basis points. A junior analyst uses only the modified duration metric to estimate the new price, calculating a 15% drop. What should the asset manager conclude about the analyst's price estimate?